Florida Marine Contractors Association
a Florida Non Profit Corporation

Information needed on permitting backlog from other FMCA members:

Posted on Aug 15 in Member Blog

FMCA Board is sending a letter to NMFS & ACOE regarding the backlog of permits. The Board is requesting the following information in order to validate our letter/request.

Date of application to ACOE
Type of job- dock, seawall, dredging, etc.
Short job description- example: “installation of a 160 sq. ft. residential dock and lift” or “dredge 120 cubic yards of material from a canal”
Natural or man-made body of water?

Feel free to email to Kelly White at kelly.white@myfmca.org

Thank you in advance for your assistance.